عربي

Generator refuelling in Ras Al Khaimah

Scheduled diesel top-ups for standby and prime-power generators.

A yellow diesel generator on a concrete pad being filled from a white fuel tanker through a black hose

Diesel Max refuels standby and prime-power generators in Ras Al Khaimah. Our tanker comes to the generator and fills its tank through the meter, on a schedule we agree with you.

Tell us the generator size, the tank capacity and how many hours a day it runs. From that we work out how often it needs a top-up, so it doesn’t run low between visits.

Standby and prime power

A standby generator waits for a power cut, then runs until the mains comes back. Its tank should stay full, so it needs a top-up after each outage and each test run.

A prime-power generator is the main source of power on a site with no grid connection. It runs every day, so its tank needs refilling on a regular cycle.

How much diesel does a generator use?

Fuel use depends on the generator’s size and how hard it is working. A published consumption chart puts a 100 kW generator at about 28 litres an hour at full load and about 16 litres an hour at half load.

The generator fuel calculator estimates litres per hour and per day for your generator, and how long a full tank lasts.

Why not to let it run dry

When a diesel engine runs out of fuel, air gets into the fuel lines, and the engine usually has to be bled before it will start again. Meanwhile the site has no power. Regular top-ups avoid both.

What to send us

  • Generator size, in kVA or kW
  • Fuel tank capacity in litres
  • Roughly how many hours a day it runs
  • The location and how to get to it
  • The days and times that suit you for top-ups
Close-up of the meter, valves and hose reel in the dispensing cabinet of a fuel tanker

Every fill

What you get with every fill

Whatever we refuel, the paperwork is the same.

Meter reading
The tanker’s meter records the litres delivered on every fill.
Signed delivery note
A signed delivery note for each delivery.
Tax invoice
A tax invoice for your accounts.

How to order

Four steps to a full tank

  1. Send the order

    Use the form below, or email the litres, location and time to fuel@dieselmax.ae

  2. We confirm

    Price per litre and your delivery slot.

  3. Metered delivery

    Our tanker fills your tank and records the meter reading.

  4. Paperwork

    Signed delivery note and tax invoice.

FAQ

Generator refuelling: common questions

Do you refuel generators on site in Ras Al Khaimah?

Yes. We top up standby and prime-power generators on sites in Ras Al Khaimah. The tanker fills the generator’s tank through its meter.

How often does a generator need refuelling?

It depends on the tank size and the running hours. Divide the tank capacity in litres by the litres used per hour to get the hours a full tank lasts. The generator fuel calculator does the sum for you.

How do I know how much diesel went in?

Every fill is metered. You get the meter reading, a signed delivery note and a tax invoice.

Can generator top-ups be on contract?

Yes. Regular top-ups can run on an agreed schedule with account terms. Email energy@dieselmax.ae or see bulk and contract supply.

Contact

Order diesel or open an account

Fill in the form and we will reply by email or phone. You can also write to us directly.

OfficeShop, Unit 1-19-9, Sheikh Saqr Bin Muhammad Al Qasimi Street, Al Qasidat, Ras Al Khaimah, UAEOpen in Google Maps ↗
Email us

Send a request

What do you need?
An estimate is fine

We only use your details to reply to this request.